In 1980, 20 years before the “Kyoto Protocol” and increased public interest in green energy, RURU installed the first bark fueled power plant in Central Europe. The entire production site has been energetically self-sustained ever since with 2,8 MW electric power and 21 t/h of steam for the KD process on basis of renewable resources. According to company growth, this power-heat cogeneration got supplemented by another boiler (32 t/h, 65 bar, 480°C) + 5 MW turbine in 2005.